Secure 25 mm Conduit, Pipe & Cable to Solid Substrates
Keeping a conduit run straight, supported & ready for the next stage of work starts with choosing a clip that suits both the service & the surface behind it. ICCONS® | Metal Conduit Clips combine a 25 mm metal saddle with a pre-assembled 25 mm PX drive pin for direct fastening of suitable tubing, corrugated pipe, cables & PVC pipe to compatible solid substrates.
For electricians, mechanical installers, plumbers, fit-out crews & maintenance teams, the pre-assembled format removes the need to pair a loose clip with a separate pin at every fixing position. The PXCON25 assembly is designed for compatible low-velocity powder-actuated equipment including the ICCONS PX375. Where the substrate or installation calls for another approach, compare Screws & Anchors, Anchors & Wall Plugs or suitable Power Tool Accessories before committing to the run.
► 25 mm metal conduit clip
► Pre-assembled 25 mm PX drive pin
► 3.7 mm pin shank
► 8 mm pin head
► Suitable for compatible low-velocity powder-actuated equipment
► Applications across tubing, corrugated pipe, cables & PVC pipe
► Suitable solid-substrate applications including concrete, stone, concrete block & solid brick
► One-piece assembly for repetitive service installation
What Are ICCONS® Metal Conduit Clips?
PXCON25 brings the saddle & drive pin together before the installer reaches the fixing point.
Rather than carrying loose clips & matching each one with an individual pin, the assembly arrives with the 25 mm PX drive pin already fitted to the metal conduit clip. A compatible low-velocity tool drives the pin into the suitable base material while the clip retains the service against the surface.
The documented configuration is:
► Part number: PXCON25
► Conduit size: 25 mm
► Drive-pin length: 25 mm
► Drive-pin shank: 3.7 mm
► Drive-pin head: 8 mm
► Configuration: Metal conduit clip with pre-assembled PX drive pin
Those details are worth recording for repeat work because conduit diameter, pin configuration & fastening method all form part of the selection.
One Clip, Several Types of Service
A conduit clip can encounter more than rigid electrical conduit once installation work moves through a commercial building or service area.
Suitable documented applications extend across:
► Tubing
► Corrugated pipe
► Cables
► PVC pipe
► Sanitary installations
Each service still needs to suit the 25 mm clip.
Rigid tubing, flexible corrugated material & cable do not behave identically when retained, so check the actual service before starting a repetitive run.
For broader practical guidance on choosing fixings around trade work, read Why Good Fasteners Matter More Than the Tool You Drive Them With.
Check the 25 mm Fit Before You Load the Tool
A clip should support the service naturally rather than rely on excessive force to make an unsuitable diameter fit.
Confirm the outside size & form of the pipe, tubing or cable being retained.
Pay particular attention where:
► Multiple conduit sizes appear on the same project
► Rigid conduit transitions into corrugated pipe
► Existing services are being extended
► Cable runs share the same work area
► Site conditions differ from drawings
► Different trades have similar-looking support hardware nearby
A quick fit check at ground level is considerably easier than discovering a mismatch after the installer is positioned for overhead work.
The Wall Can Change Even When the Conduit Doesn't
A service route may begin on concrete then continue across completely different construction.
Suitable PXCON25 applications include compatible:
► Concrete
► Stone
► Concrete block
► Solid brick
Identify the material at each fixing area rather than judging only by the visible wall finish.
Renovation work deserves particular attention. Render, paint, lining material or previous repairs can hide changes in the base material beneath the surface.
Where the fixing point requires drilling instead, Concrete Cutting & Drilling Tools can support an alternative installation method.
Straight Conduit Starts Before the First Clip
Secure fixings cannot correct a service route that was poorly set out.
Establish the line before fastening.
Mark or confirm:
► Starting position
► Final connection point
► Bends
► Junctions
► Penetrations
► Equipment entries
► Changes in level
► Obstructions
► Suitable support positions
For visible or extended runs, Measuring & Layout Tools can help maintain consistent alignment.
Good set-out also makes it easier to spot where the substrate changes before the installer reaches that section.
Why Use a Pre-Assembled PX Clip?
Repetitive work becomes simpler when fewer loose components need to be selected at every fixing position.
PXCON25 already combines the metal clip with its drive pin.
The installer therefore handles one prepared assembly rather than separately matching a saddle & pin for each fixing.
That can be useful across longer runs because it helps:
► Reduce loose-component handling
► Keep the intended pin with the clip
► Simplify consumable preparation
► Reduce pin-length mix-ups
► Keep repetitive installation more orderly
Pre-assembly improves convenience but does not remove the need to check the service, substrate & equipment.
The PX375 Is Part of the Compatibility Picture
Correct clips are little use to a crew if the equipment on site cannot install them.
PXCON25 is designed for the ICCONS PX375 & most other compatible low-velocity powder-actuated tools.
Before work begins, confirm:
► Tool model
► Equipment condition
► Correct operating setup
► PXCON25 compatibility
► Suitable substrate
► Applicable site requirements
Where fastening equipment sees regular trade use, A tool is not just a tool. It’s a promise. provides practical guidance around keeping equipment ready for demanding work.
Give the First Fixing More Attention Than the Fiftieth
The opening installation provides an opportunity to confirm the setup before repetition takes over.
At an appropriate representative position, inspect how the clip, service & substrate behave together.
Look for:
► Clip seating against the surface
► Appropriate retention of the service
► Unexpected substrate damage
► Excessive penetration
► Insufficient penetration
► Clip deformation
► Movement at the fixing point
If something looks wrong, investigate before continuing.
Repeating an incorrect setup faster does not improve the finished installation.
Don't Use the Fastener to Force the Pipe Into Shape
Service retention should not become service distortion.
The clip needs to hold the pipe, tubing or cable appropriately without being used to compensate for an obvious size mismatch or poor alignment.
Flexible corrugated pipe may respond differently from rigid PVC pipe while cable presents another set of handling considerations.
Before fixing:
► Confirm the service suits the clip
► Position the service correctly
► Seat the clip naturally
► Keep the fixing point aligned
► Check the finished retention
If substantial force is needed simply to make the service sit inside the clip, reconsider the fit before fastening.
Corners Deserve Different Thinking From Straight Runs
A long wall can make clip placement repetitive until the service reaches a bend, junction or equipment entry.
Plan these transitions before fixing the surrounding clips.
Pay particular attention around:
► Direction changes
► Vertical risers
► Junction boxes
► Equipment connections
► Penetrations
► Tight service corridors
► Areas shared with other trades
Support positions should work with the route rather than being chosen solely because the tool can reach them easily.
For unusual fastening requirements around these transitions, Specialty Fasteners & Fixings provides additional options to consider.
Existing Buildings Require a Closer Look
Extensions & repairs often reveal conditions that were never shown on the original plan.
A new conduit section may cross patched masonry, older concrete, solid brick or another base material before reaching its destination.
Watch for:
► Previous fixing holes
► Cracked areas
► Deteriorated masonry
► Repairs
► Changes in wall construction
► Hollow-sounding sections
► Damaged fixing positions
Do not continue with the same fastening method automatically when the substrate changes.
A new section of wall deserves a fresh assessment.
When Does a Drilled Fixing Make More Sense?
Direct fastening is useful where the service, substrate & installation method suit it; elsewhere, drilling may provide the appropriate connection.
Consider changing methods where:
► The base material is unsuitable for direct fastening
► A specified anchor is required
► Existing damage affects the intended fixing position
► The support arrangement needs another type of fastener
► Site requirements call for a drilled connection
► Installation results are inconsistent
For suitable conventional concrete connections, compare Anchor Bolts.
Changing fastening methods at the right point is better than trying to make one system cover every condition along the route.
Think Beyond the Conduit Already on the Wall
A service run that looks clear today may share its space with ducting, pipework, cable trays or equipment access tomorrow.
Before committing to the fixing positions, consider:
► Nearby services
► Planned ductwork
► Pipe runs
► Cable containment
► Structural elements
► Access panels
► Equipment servicing zones
► Future installation stages
A small change in clip position during set-out can sometimes preserve valuable access later.
For crews preparing equipment & consumables ahead of heavier site activity, Spring Jobsite Prep Getting Your Gear Ready provides further practical preparation guidance.
A Fast Pre-Installation Check
Before opening multiple boxes, confirm that the complete setup belongs together.
Service
Is the 25 mm clip suitable for the tubing, corrugated pipe, cable or PVC pipe being retained?
Surface
Is the fixing location a compatible solid substrate?
Route
Have bends, transitions, penetrations & equipment entries been considered?
Equipment
Is the low-velocity powder-actuated tool compatible with the PXCON25 assembly?
Result
Does the first suitable installation seat correctly without damaging the service or producing unexpected substrate behaviour?
Five checks before a repetitive run can save considerably more time than correcting unsuitable fixings afterwards.