2 customers are viewing this product

Bordo - Diamond Mist Drill Water Bottle Swivel Set | 2712-WBS

Bordo – 5mm Diamond Mist Drill Set | 2712-S1 The Bordo 5mm Diamond Mist Drill Set is designed for precision water-fed drilling in porcelain, ceramic tiles and stone. Built for professional installers, it provides clean, accurate holes with... Read More
Vendor: Bordo
SKU: 2712-WBS
Product type: Set
$173.88
$0.00
$173.88
Subtotal: $173.88

On Time, Every Time

Reliable delivery guaranteed.

Secure Payments

Shop with confidence.

100% Happiness Guarantee

Only at Industrial Shed.

Bordo – 5mm Diamond Mist Drill Set | 2712-S1

The Bordo 5mm Diamond Mist Drill Set is designed for precision water-fed drilling in porcelain, ceramic tiles and stone. Built for professional installers, it provides clean, accurate holes with minimal chipping.

Part of the Diamond Mist system, this set ensures controlled cooling and improved diamond performance in hard material applications.

Product Type: Diamond Drill Set
Brand: Bordo
Diameter: 5 mm
System: Diamond Mist
Part Number: 2712-S1
Application: Water-fed drilling in porcelain, ceramic & stone

► Key Features

‣ Precision 5mm drilling capacity
‣ Water-fed cooling system
‣ Clean hole cutting with minimal chipping
‣ Designed for hard tile applications
‣ Professional trade-grade durability

► Why Tradies and Contractors Buy This

‣ Ideal for small fixture penetrations
‣ Reliable tile drilling performance
‣ Extends tool life with cooling system
‣ Trusted Bordo industrial quality
‣ Backed by Industrial Shed’s fast dispatch and trade support

► Stock won’t last — get yours now at Industrial Shed!

At Industrial Shed, we know you need your gear fast and without the runaround. Here’s what makes our shipping better:

Local Delivery, Done In-House: If you're on the Mornington Peninsula, we handle delivery ourselves—no middlemen, no delays. Get your tools the same day or next day, straight from our team to your door.

Nationwide Reach, Reliable Partners: Need it shipped across Australia? We work with top couriers to offer standard and express options, so you get your order when you need it.

Track Every Step: You’ll get a tracking number the moment your order ships. No guessing—just a clear view of where your delivery’s at.

Service with a Real Human Touch: Got special delivery needs? Give us a shout. We’re here to make it happen, no fuss.

With Industrial Shed, you're not just another package in the mail. We get your order to you fast, safe, and with the reliability you expect.

For more information, visit Shipping Details: The Essentials.

At Industrial Shed, we keep things simple. If something’s not right or you’re not satisfied, we’ll sort it out—fast and easy.

What Sets Us Apart?

Fast Turnaround: We don’t mess around. When you need to return an item, we process it quickly so you’re not left waiting. Our goal is to get your refund or exchange sorted fast so you can get back to work.

Local Touch: For customers on the Mornington Peninsula, we offer the added benefit of in-store returns for quicker resolution. No shipping hassles—just bring it back to us, and we’ll handle the rest.

No-Nonsense Support: We make returns and refunds straightforward. If there’s a problem, you won’t be stuck in endless back-and-forths. We’re hands-on and get it sorted with minimal hassle.

Clear Policies, No Surprises: We believe in being upfront. Our return and refund policy is clear, so you know exactly what’s covered—whether it’s warranty claims, special orders, or regular returns. You’ll never be left guessing.

Built for Tradies: We understand the demands of the job, so we’re all about making returns and refunds simple, quick, and no fuss—because downtime is the last thing you need.

For more information, visit Returns & Refunds: Straight Talk.

You May Also Like